Electric and Communication Facilities Audit Reports
Electric Facilities Audit Reports
2024 UTILITY / REPORT LINK | AREA | TYPE OF AUDIT | START DATE | REPORT ID | UTILITY RESPONSE |
SCE |
Manifee District | Distribution | December 2, 2024 | EA2024-1260 |
|
SCE |
Orange County AOR | Substation |
November 4, 2024 | SA2024-1211 | |
SDG&E |
Northeast District | Substation |
October 28, 2024 |
SA2024-1210 | |
IID |
El Centro District | Distribution | October 21, 2024 | EA2024-1258 | |
PG&E |
Pismo Beach HQ | Substation |
October 14, 2024 | SA2024-1263 | |
SCE |
Thousand Oaks District |
Distribution |
October 7, 2024 | EA2024-1259 |
SCE - Response |
SCE |
Mira Loma AOR |
Substation | September 23, 2024 | SA2024-1208 |
SCE - Response |
SDG&E |
Metro District | Transmission | September 16, 2024 | TA2024-1256 |
SDG&E - Response |
LADWP |
West Los Angeles District | Distribution | September 9, 2024 | EA2024-1224 | LADWP - Response |
SCE |
South Bay District | Distribution | August 26, 2024 | EA2024-1223 | SCE - Response |
PG&E |
North Valley Division |
Distribution |
August 19, 2024 | EA2024-1238 |
|
SCE |
Santa Barbara District |
Distribution | August 12, 2024 | EA2024-1257 | SCE - Response |
PacifiCorp |
Klamath Falls Substations |
Substation |
August 12, 2024 |
SA2024-1232 |
|
SDG&E |
Southern Orange County District |
Distribution | August 5, 2024 | EA2024-1247 | SDG&E - Response |
SCE | Covina District |
Distribution | July 29, 2024 | EA2024-1275 | SCE - Response |
Burbank Water and Power | Burbank Water and Power | Distribution | July 29, 2024 | EA2024-1234 | |
Moreno Valley Electric Utility | Moreno Valley Electric Utility |
Distribution | July 22, 2024 | EA2024-1222 |
|
SDG&E |
North Coast District |
Distribution |
July 15, 2024 |
EA2024-1255 |
|
PG&E |
Stockton Division |
Distribution |
July 15, 2024 | EA2024-1221 |
|
SCE |
Shaver Lake District |
Distribution | June 24, 2024 | EA2024-1140 | SCE - Response |
MVU |
Moreno Valley Electric Utility |
Distribution | June 22, 2024 |
EA2024-1222 | MVU - Response |
Surprise Valley Electrification Corporation |
Surprise Valley Electrification Corporation |
Distribution |
June 18, 2024 |
EA2024-1179 |
|
LADWP |
Northridge Metro District |
Transmission | June 17, 2024 |
TA2024-1139 | LADWP - Response |
PG&E |
San Francisco Division |
Distribution | June 10, 2024 | EA2024-1190 |
PG&E - Response |
SCE | Kernville District |
Distribution |
June 10, 2024 | EA2024-1138 |
SCE - Response |
PG&E |
Moss Landing HQ |
Substation | June 3, 2024 |
SA2024-1172 | PG&E - Response |
SCE |
San Joaquin District |
Distribution | June 3, 2024 |
EA2024-1137 |
SCE - Response |
SCE | Antelope Valley District |
Distribution |
May 28, 2024 | EA2024-1115 |
SCE - Response |
SCE |
Ventura District |
Distribution |
May 20, 2024 | EA2024-1136 | SCE - Response |
LMUD | LMUD | Distribution, Transmission, and Substation | May 13, 2024 |
EA2024-1189 |
|
SCE |
Victorville District |
Distribution |
May 13, 2024 | EA2024-1135 |
SCE - Response |
PG&E |
Cottonwood HQ | Substation | May 6, 2024 | SA2024-1171 | PG&E - Response |
REU |
Redding Electric Utility |
Distribution and Transmission | April 29, 2024 |
EA2024-1174 | REU - Response |
PG&E |
San Jose Division |
Distribution |
April 22, 2024 |
EA2024-1176 |
PG&E - Response |
SCE | Rector AOR | Substation |
April 22, 2024 | SA2024-1132 |
SCE - Response |
SDG&E | Eastern Region |
Transmission |
April 15, 2024 | TA2024-1130 |
SDG&E - Response |
City of Lompoc |
City of Lompoc Utilities Department Electric Division |
Distribution |
April 8, 2024 | EA2024-1192 |
City of Lompoc - Response |
PG&E |
Willits HQ |
Transmission | April 8, 2024 |
TA2024-1173 |
PG&E - Response |
SCE | Barstow District |
Distribution | April 8, 2024 |
EA2024-1129 |
|
PacifiCorp |
Yreka Division |
Distribution |
March 25, 2024 |
EA2024-1187 |
PacifiCorp - Response |
SDG&E | North Coast | Substation |
March 25, 2024 | SA2024-1128 | SDG&E - Response |
SCE | Redlands District | Distribution | March 25, 2024 | EA2024-1127 | SCE - Response |
SCE | Tehachapi District |
Distribution |
March 18, 2024 |
EA2024-1126 |
SCE - Response |
PG&E |
Hayward HQ |
Substation | March 11, 2024 | SA2024-1170 | PG&E - Response |
SMUD | Sacramento Municipal Utility District |
Distribution |
March 4, 2024 | EA2024-1186 |
SMUD - Response |
SCE |
San Joaquin Transmission Grid |
Transmission | March 4, 2024 | TA2024-1124 |
SCE - Response |
IID |
La Quinta Service Area |
Substation | March 4, 2024 | SA2024-1123 |
|
PG&E |
Mission Division | Distribution |
February 26, 2024 | EA2024-1182 |
PG&E - Response |
SDG&E | Eastern District |
Distribution | February 26, 2024 | EA2024-1122 |
SDG&E - Response |
SCE | San Jacinto Grid |
Transmission |
February 26, 2024 |
TA2024-1120 |
SCE - Response |
SCE |
Yucca Valley District |
Distribution |
February 12, 2024 |
EA2024-1119 |
SCE - Response |
LADWP | West District | Transmission | February 12, 2024 | TA2024-1117 | LADWP - Response |
PG&E |
McMaude HQ |
Substation |
February 5, 2024 |
SA2024-1169 |
PG&E - Response |
IID |
Coachella Valley District |
Distribution | February 5, 2024 | EA2024-1118 |
IID - Response |
SCE | Ventura Switching Center |
Substation |
January 29, 2024 | SA2024-1116 |
SCE - Response |
2023 UTILITY / REPORT LINK |
AREA | TYPE OF AUDIT | START DATE | REPORT ID | UTILITY RESPONSE |
SCE |
Wildomar District |
Distribution | December 18, 2023 | EA2023-1107 |
|
SCE | Orange County switching Center |
Substation |
December 11, 2023 | SA2023-1106 |
SCE - Response |
PG&E |
Vaca Dixon Headquarters | Substation | December 4, 2023 | SA2023-1154 |
PG&E - Response |
PG&E |
Sacramento Division |
Distribution | December 4, 2023 | EA2023-1146 | |
SCE |
Menifee District |
Distribution | December 4, 2023 | EA2023-1105 |
SCE - Response |
LADWP |
Van Nuys District |
Distribution |
December 4, 2023 |
EA2023-1059 |
|
SCE |
Mesa Switching Center |
Substation |
November 27, 2023 | SA2023-1103 |
SCE - Response |
PG&E |
Sierra Division |
Distribution | November 13, 2023 | EA2023-1143 | |
Riverside Public Utilities |
Riverside Public Utilities |
Distribution |
November 13, 2023 |
EA2023-1102 |
|
Glendale Water & Power |
Glendale Water & Power |
Substation | October 30, 2023 | SA2023-1099 | |
SCE | Bishop District | Distribution | October 30, 2023 | EA2023-1098 | SCE - Response |
SCE | Fullerton District | Distribution | October 16, 2023 | EA2023-1097 | SCE - Response |
PG&E |
Eureka HQ | Substation | October 16, 2023 | SA2023-1151 | PG&E - Response |
PG&E | Yosemite Division | Distribution | October 16, 2023 | EA2023-1141 | |
MID - Merced |
Merced Irrigation District | Distribution | October 9, 2023 | EA2023-1167 | MID - Merced - Response |
SDG&E |
Orange County District |
Substation | October 9, 2023 | SA2023-1095 | SDG&E - Response |
Vincent Switching Center | Substation | October 2, 2023 | SA2023-1094 | SCE - Response | |
SVP | Silicon Valley Power |
Distribution, Transmission, and Substation | September 25, 2023 | EA2023-1150 |
SVP - Response |
SCE |
Arrowhead District | Distribution | September 25, 2023 | EA2023-1093 |
SCE - Response |
MID - Modesto | MID Service District | Distribution | September 18, 2023 | EA2023-1148 | MID - Response |
SCE | Whittier District | Distribution | September 18, 2023 | EA2023-1091 | |
PG&E |
Bakersfield Headquarters |
Substation | September 13, 2023 |
SA2023-1153 | PG&E - Response |
SCE | Compton District | Distribution | September 11, 2023 | EA2023-1090 | SCE - Response |
PG&E |
Victor HQ |
Transmission | September 11, 2023 |
TA2023-1158 |
PG&E - Response |
TDPUD | Truckee Donner Public Utilities District |
Substation and Distribution | September 11, 2023 | EA2023-1147 | TDPUD - Response |
SCE |
Compton District |
Distribution |
September 11, 2023 |
EA2023-1051 |
|
PG&E | North Bay Division | Distribution | September 11, 2023 |
EA2023-1145 | PG&E - Response |
PG&E | Los Padres Division | Distribution | August 28, 2023 | EA2023-1142 | |
Ontario District |
Distribution | August 21, 2023 |
EA2023-1088 | ||
SDG&E | San Diego Metro District | Distribution | August 21, 2023 | EA2023-1086 | |
PG&E | Table Mountain HQ | Transmission | August 14, 2023 | TA2023-1157 | PG&E - Response |
SCE |
Facilities on Catalina Island |
Distribution | August 7, 2023 | EA2023-1084 | SCE - Response |
SDG&E | Beach Cities | Substation | August 7, 2023 | SA2023-1083 |
|
City of Palo Alto Utilities Electric Facilities |
City of Palo Alto Utilities Electric Facilities | Distribution | August 7, 2023 | EA2023-1149 | City of Palo Alto Utilities Electric Facilities - Response |
PG&E | Humboldt Division | Distribution | July 31, 2023 | EA2023-1144 | |
SCE | Valencia District | Distribution | July 31, 2023 | EA2023-1082 | |
BVES | Bear Valley Electric Service District |
Distribution | July 10, 2023 | EA2023-1078 | |
SCE | Long Beach District | Distribution | July 10, 2023 | EA2023-1079 | |
PacifiCorp | Alturas and Tulelake Divisions | Distribution | June 20, 2023 | EA2023-1071 | PacifiCorp - Response |
SCE | North Coast Grid | Transmission | June 20, 2023 | TA2023-1065 | SCE - Response |
IID | El Centro District | Substation | June 12, 2023 | SA2023-1064 | |
SCE | Lugo Switching Center | Substation | June 12, 2023 | SA2023-1063 | |
SCE | Santa Monica District | Distribution | June 5, 2023 | EA2023-1062 | SCE - Response |
SCE | Orange Grid |
Transmission | May 22, 2023 | TA2023-1067 | SCE - Response |
PG&E | Midway HQ Oakland | Transmission | May 22, 2023 | TA2023-1067 | |
Alameda Municipal Power | Alameda | Distribution | May 15, 2023 | EA2023-1073 | Alameda Municipal Power - Response |
SCE | Devers Switching Center | Substation | May 15, 2023 | SA2023-1060 | SCE- Response |
PG&E | Diablo | Distribution | May 1, 2023 | EA2023-1077 | |
SCE |
Thousand Oaks District |
Distribution | May 1, 2023 | EA2023-1057 | SCE - Response |
SCE | Monrovia District | Distribution | April 24, 2023 | EA2023-1056 | |
SCE | Saddleback District | Distribution | April 10, 2023 | EA2023-1053 | SCE - Response |
Anaheim Public Utilities Switching Center | Anaheim Public Utilities Switching Center |
Substation | April 10, 2023 | SA2023-1046 |
Anaheim Public Utilities Switching Center - Response |
SDG&E | Eastern District | Substation | March 13, 2023 | SA2023-1049 |
|
IID | Imperial Valley | Transmission | March 6, 2023 | TA2023-1047 | |
SCE | Metro East Grid | Transmission | April 17, 2023 | TA2023-1055 | |
SCE | Oak Hills Grid | Transmission | February 6, 2023 | TA2023-1043 | |
SCE | Foothill District | Distribution | March 20, 2023 | EA2023-1051 | |
SCE | Orange County and Lighthipe Switching Centers | Substation | March 13, 2023 | SA2023-1050 | |
SCE | El Nido Switching Center | Substation | February 27, 2023 | SA2023-1046 | |
Vista Switching Center | Substation | March 6, 2023 | SA2023-1048 | ||
Banning Electric Utility | City of Banning | Distribution | February 13, 2023 | EA2023-1044 | |
SCE | Santa Barbara District | Distribution | February 13, 2023 | EA2023-1045 | |
2022 UTILITY / REPORT LINK | AREA |
TYPE OF AUDIT |
START DATE |
REPORT ID | UTILITY RESPONSE |
LADWP | Wilmington District | Distribution | November 28, 2022 | EA2022-985 | |
SDG&E | Mountain, Inland and Coastal Transmission Area | Transmission | December 12, 2022 | TA2022-991 | |
SDG&E | Northeast | Substation | December 5, 2022 | SA2022-963 | |
SMUD | Sacramento | Transmission | December 12, 2022 | TA2022-1013 | |
Moss Landing | Transmission | October 24, 2022 | TA2022-1021 | ||
SCE | Santa Ana District | Distribution | December 5, 2022 | EA2022-986 | |
SDG&E | Metro | Substation | December 12, 2022 | SA2022-957 | |
Banning Electric Utility | City of Banning | Distribution and Substation | August 30, 2022 | SA2022-953 & EA2022-1072 | |
SCE | Highland Grid | Transmission | October 31, 2022 |
TA2022-990 | |
SCE | Eastern Grid | Transmission | October 10, 2022 | TA2022-989 | |
LADWP | South LA District | Substation | October 17, 2022 | SA2022-960 | |
LADWP | Central District | Distribution | September 19, 2022 | EA2022-998 | |
IID | La Quinta District | Transmission | April 11, 2022 | TA2022-987 | |
SCE | El Dorado Switching Center | Substation | September 26, 2022 | SA2022-955 | |
Pasadena Water and Power | City of Pasadena | Substation | May 2, 2022 | SA2022-959 | |
City of Colton Electric Utility | City of Colton | Distribution | May 16, 2022 | EA2022-972 | |
SCE | Lugo Switching Center | Substation | November 7, 2022 | SA2022-956 | |
Liberty Utilities | Lake Tahoe District | Substation & Transmission | September 26, 2022 | SA2022-1020 & TA2022-1019 | |
PG&E | Table Mountain HQ | Substation | September 12, 2022 | SA2022-1007 | |
PG&E | Gates HQ | Substation | October 3, 2022 | SA2022-1023 | |
Roseville Electric | City of Roseville | Distribution | June 13, 2022 | EA2022-1010 | |
Lodi Electrical Utility | City of Lodi | Distribution | September 26, 2022 | EA2022-1000 | |
PG&E | Peninsula Division | Distribution | August 29, 2022 | EA2022-1015 | |
PG&E | Fresno Division | Distribution | November 12, 2022 | EA2022-1012 | |
SCE | Bishop-Mammoth Switching Center | Substation | November 14, 2022 | SA2022-954 | |
SCE | Metro West Grid | Transmission | August 15, 2022 | TA2022-988 | |
Vernon Public Utilities | City of Vernon | Distribution | October 10, 2022 | EA2022-983 | |
SCE | Monrovia District | Distribution | October 17, 2022 | EA2022-984 | |
BWP | Burbank | Distribution | September 19, 2022 | EA2022-981 | |
SDG&E |
Beach Cities District | Distribution | August 1, 2022 | EA2022-979 | |
PG&E | Eureka Headquarters | Transmission | August 12, 2022 | TA2022-1008 | |
PG&E | Peninsula Division | Distribution | August 29, 2022 | EA2022-1015 | |
LADWP | Northridge District | Distribution | August 8, 2022 | EA2022-980 | |
LADWP | Metro District | Substation | August 29, 2022 | SA2022-961 | |
Glendale Water & Power | Glendale | Distribution | July 25, 2022 | EA2022-978 | |
SCE | South Bay District | Distribution | June 27, 2022 | EA2022-977 | |
PG&E | Central Coast District | Distribution | June 13, 2022 | EA2022-1014 | |
Roseville Electric Utility (REU) | City of Roseville | Distribution | June 13, 2022 | EA2022-1010 | |
PG&E | Fresno HQ | Substation | June 6, 2022 | SA2022-1006 | |
SCE | Covina District | Distribution | June 13, 2022 | EA2022-976 | |
Anaheim Public Utility | City of Anaheim | Distribution | June 6, 2022 | EA2022-975 | |
Liberty Utilities | Tahoe Division | Distribution | May 23, 2022 | EA2022-1003 | |
Azusa Light & Water | City of Azusa | Distribution and Substation combined | May 9, 2022 | SA2022-950 / EA2022-1018 | |
Anza Electric Cooperative, Inc. | City of Anza | Distribution | April 25, 2022 | EA2022-969 | |
Needles Public Utilities Authority Electric Department | City of Needles | Distribution | May 23, 2022 | EA2022-973 | |
City of Moreno Valley | City of Moreno Valley | Distribution | May 9, 2022 | EA2022-970 | |
BVES | Bear Valley Electric Service District | Substation | April 21, 2022 | SA2022-958 | |
SCE | Montebello District | Distribution | May 2, 2022 | EA2022-974 | |
SCE | Palm Springs District | Distribution | May 16, 2022 | EA2022-971 | |
PacifiCorp | Yreka/Siskiyou Districts | Transmission | May 3, 2022 | TA2022-995 | |
PacifiCorp | Siskiyou/Shasta Division | Substation | April 11, 2022 | SA2022-1002 | |
SCE |
Valley Switching Center |
Substation | April 11, 2022 | SA2022-949 | |
PG&E | Concord HQ | Substation | April 4, 2022 | SA2022-1004 | |
PacifiCorp | Crescent City Division | Distribution | March 22, 2022 | EA2022-1001 | |
SCE | Blythe District | Distribution | March 7, 2022 | EA2022-966 | |
SCE | Mira Loma District | Substation | February 28, 2022 | SA2022-948 | |
PG&E | Sonoma District | Distribution | February 28, 2022 | EA2022-992 | |
PG&E | Sacramento District | Transmission | February 7, 2022 | TA2022-994 | |
SCE |
Long Beach District |
Distribution | February 7, 2022 |
EA2022-964 | |
SCE | Ridgecrest District | Distribution | February 14, 2022 |
EA2022-965 | |
SCE | Foothill District | Distribution |
March 21, 2022 |
EA2022-967 | |
2021 UTILITY / REPORT LINK | AREA | TYPE OF AUDIT | START DATE | REPORT ID | UTILITY RESPONSE |
PWP | Pasadena | Distribution | August 9, 2021 | EA2021-910 | |
PG&E | Stockton | Substation | March 22, 2021 |
SA2021-887 | |
PG&E | North Valley | Distribution | April 19, 2021 |
EA2021-913 | |
SMUD | Sacramento | Substation | November 15, 2021 |
SA2021-915 | |
Shasta |
Distribution/ Substation |
June 7, 2021 |
EA2021-916/ SA2021-917 |
||
PG&E | East Bay District |
Distribution |
June 21, 2021 | EA2021-920 | |
PG&E | Metcalf/Concord |
Transmission | May 24, 2021 |
TA2021-921 | |
PG&E | Daly City Area/Martin HQ |
Substation |
July 19, 2021 |
SA2021-922 | |
PacifiCorp | Modoc - Alturas/Tuleake |
Transmission | September 27, 2021 |
TA2021-923 | |
Portola/Susanville |
Distribution |
November 15, 2021 |
EA2021-925 | ||
PG&E | Pismo Beach |
Transmission | December 6, 2021 |
TA2021-931 | |
SCE |
Ventura District |
Substation | November 1, 2021 |
SA2021-927 | |
SCE | Barstow District | Distribution | December 6, 2021 |
EA2021-930 | |
SCE | Metro East District |
Transmission | October 18, 2021 |
TA2021-928 |
|
SCE |
Kernville District |
Distribution | September 13, 2021 |
EA2021-912 |
|
Shaver Lake District | Distribution | July 26, 2021 | EA2021-908 | ||
SCE |
Thousand Oaks District | Distribution | June 28, 2021 |
EA2021-905 | |
SCE | San Jacinto-Menifee District | Distribution | July 12, 2021 |
EA2021-907 |
|
SCE |
Dominguez Hills District | Distribution | June 7, 2021 |
EA2021-902 | |
SDG&E | Beach Cities District |
Substation | May 10, 2021 |
SA2021-899 | |
SDG&E | Southern Orange County and North San Diego County | Transmission | June 14, 2021 | TA2021-903 | |
PG&E | Stockton Headquarters | Substation | March 22, 2021 |
SA2021-887 | |
LADWP | West LA District | Distribution | March 1, 2021 | EA2021-890 | |
SCE | Tehachapi District | Distribution |
April 26, 2021 | EA2021-897 |
|
SCE | Mesa District | Substation | March 22, 2021 | SA2021-893 | |
SCE |
Orange Coast District | Transmission |
March 8, 2021 |
TA2021-891 | |
SDG&E | North Coast Region | Distribution | March 22, 2021 | EA2021-892 | |
SCE | Arrowhead District | Distribution | May 3, 2021 | EA2021-898 | |
SCE |
Santa Monica District |
Distribution |
April 5, 2021 |
EA2021-894 | |
SCE |
Huntington Beach District | Distribution |
February 22, 2021 |
EA2021-888 | |
SCE |
Redlands District |
Distribution | August 23, 2021 | EA2021-911 | |
2020 UTILITY / REPORT LINK | AREA | TYPE OF AUDIT | START DATE | REPORT ID | UTILITY RESPONSE |
BVES |
Bear Valley Electric Service District |
Distribution | November 16, 2020 |
EA2020-866 | |
SCE | Bishop District |
Distribution | December 7, 2020 |
EA2020-879 | |
LADWP |
Palms District |
Distribution | September 21, 2020 |
EA2020-880 | |
SDG&E | Orange County | Distribution | August 24, 2020 |
EA2020-881 | |
PG&E |
Lakeville Division |
Transmission | September 14, 2020 |
TA2020-867 | |
PacifiCorp |
Del Norte District |
Transmission | October 6, 2020 |
TA2020-869 | |
PG&E | Fresno Division |
Transmission | November 16, 2020 |
TA2020-884 | |
SCE |
North Coast District |
Transmission | October 26, 2020 |
TA2020-883 | |
Kern Division | Distribution | February 24, 2020 | EA2020-855 | ||
SCE | Yucca Valley | Distribution | February 10, 2020 | EA2020-859 | |
SDG&E - (Records Review) | Northeast District | Distribution |
June 2020 (Records) September 21, 2020 (Field) |
EA2020-856 | |
SCE | Valencia District | Distribution | July 27, 2020 | EA2020-858 | |
PG&E - (Records Review) | Stockton Division | Distribution |
July 28, 2020 (Records) October 5, 2020 (Field) |
EA2020-862 | |
PG&E - (Records Review) | San Carlos HQ | Substation |
August 5, 2020 October 12, 2020 |
SA2020-854 | |
PG&E | Lakeville Division | Transmission | August 27, 2020 | TA2020-867 | |
Trinity Public Utilities District | Trinity | Distribution | August 3, 2020 | EA2020-874 | |
PG&E | Cupertino HQ | Substation | September 21, 2020 | SA2020-870 | |
Pacificorp | Yreka | Distribution | June 27, 2020 | EA2020-864 | |
SCE | Ventura District | Distribution | August 10, 2020 | EA2020-877 | |
SCE | Saddleback District | Distribution | August 24, 2020 | EA2020-857 | |
SCE | Wildomar District | Distribution | September 14, 2020 | EA2020-863 |
Communication Infrastructure Provider (CIP) Audit Reports
2024 UTILITY / REPORT LINK | AREA | START DATE | REPORT ID | UTILITY RESPONSE |
AT&T |
Contra Costa & Alameda Counties | October 7, 2024 | CA2024-1267 | |
Crown Castle Communications |
NorCal Region | September 23, 2024 | CA2024-1235 |
|
Frontier |
LA County North Area |
September 23, 2024 | CA2024-1219 |
Frontier - Response |
Verizon |
San Francisco & San Mateo County Regions | September 16, 2024 | CA2024-1306 | |
AT&T |
Plumas, Sierra, and Nevada County Regions | September 9, 2024 |
CA2024-1249 | |
Comcast |
Sacramento Metro Region |
August 26, 2024 | CA2024-1236 |
Comcast - Response |
SEI | Kerman and Foresthill Service Areas | July 29, 2024 | CA2024-1231 | SEI - Response |
Crown Castle Communications | San Diego County North District |
July 29, 2024 |
CA2024-1207 | |
Comcast |
South Bay Region |
July 22, 2024 |
CA2024-1230 | Comcast - Response |
Frontier |
Santa Barbara County Area |
July 8, 2024 | CA2024-1196 |
Frontier - Response |
AT&T |
East Kern County District | May 6, 2024 | CA2024-1134 | AT&T - Response |
Vyve Broadband |
Mt Shasta Region | April 29, 2024 | CA2024-1191 | Vyve Broadband - Response |
Ventura County West District |
Ventura County West District | April 29, 2024 | CA2024-1133 | Ventura County West District - Response |
AT&T |
South Orange County Construction Area |
April 22, 2024 | CA2024-1131 |
AT&T - Response |
Frontier North |
Williams, Maxwell, Princeton, Colusa, Arbuckle, Grimes, Guinda, Knights Landing, and Robbins |
April 15, 2024 |
CA2024-1188 |
Frontier - Response |
Comcast |
West Bay Region |
April 15, 2024 |
CA2024-1183 |
Comcast - Response |
Volcano Telephone Company |
Pine Grove Service Area | March 18, 2024 | CA2024-1178 | Volcano Telephone Company - Response |
Frontier | Ventura County Area |
March 11, 2024 | CA2024-1125 | |
Mediacom |
Lake County Service Area | February 26, 2024 |
CA2024-1177 | Mediacom - Response |
Charter |
East Ventura County Area |
February 26, 2024 | CA2024-1121 |
Charter - Response |
Charter |
Tulare County Region |
February 12, 2024 | CA2024-1175 | Charter - Response |
Charter |
West Los Angeles County area |
January 22, 2024 | CA2024-1168 |
Charter - Response |
Frontier |
Riverside County West Service Area |
January 8, 2024 | CA2024-1114 |
Frontier - Response |
2023 UTILITY / REPORT LINK | AREA | START DATE | REPORT ID | UTILITY RESPONSE |
Charter |
SoCal North Management Area - Imperial County |
December 4, 2023 | CA2023-1104 |
Charter - Response |
Charter |
Morgan Hill Area |
December 1, 2023 | CA2023-1163 |
|
AT&T |
Mendocino and Lake Counties |
November 27, 2023 | CA2023-1160 |
AT&T - Response |
Verizon |
Morgan Hill/Gilroy Region | November 13, 2023 | CA2023-1159 | Verizon - Response |
AT&T |
Los Angeles Construction Avalon Area |
November 13, 2023 | CA2023-1101 |
|
Crown Castle Communications |
Los Angeles County East Regions |
November 13, 2023 |
CA2023-1100 |
Crown Castle Communications - Response |
Comcast |
East Bay Region | October 23, 2023 | CA2023-1162 | Comcast - Response |
Verizon |
Los Angeles County Area |
October 16, 2023 | CA2023-1096 |
|
T-Mobile | North Los Angeles County | September 18, 2023 | CA2023-1028 | |
Crown Castle Communications | Santa Barbara County | September 5, 2023 | CA2023-1087 | |
Verizon | San Bernadino County | July 24, 2023 | CA2023-1108 | |
AT&T |
North San Diego County |
July 17, 2023 | CA2023-1081 | |
Frontier | Crescent City/Garberville/Leggett Service Area | July 10, 2023 | CA2023-1163 | |
Comcast | North Bay Region | July 10, 2023 | CA2023-1161 | |
Verizon | Ventura County |
June 26, 2023 | CA2023-1039 | |
AT&T |
Los Angeles Region Ventura County District |
June 19, 2023 | CA2023-1033 |
|
Charter | West Riverside County | June 5, 2023 | CA2023-1038 | |
Verizon | San Diego County | May 15, 2023 | CA2023-1040 | |
Cox Communications | Orange County and Palos Verdes District | May 8, 2023 | CA2023-1025 | |
Charter | San Luis Obispo County Service Area | May 1, 2023 | CA2023-1037 | Charter - Response |
Comcast | Central Valley Region | April 24, 2023 | CA2023-1074 | |
Verizon | Santa Barbara County | March 20, 2023 | CA2023-1027 | |
Charter | East Riverside County District | March 6, 2023 | CA2023-1034 | |
AT&T | South Orange County District | May 1, 2023 | CA2023-1032 | |
Charter | Kern County East District | April 17, 2023 | CA2023-1036 | |
AT&T | Imperial County | February 13, 2023 | CA2023-1029 | |
AT&T | Riverside and West San Bernardino County District | April 17, 2023 | CA2023-1031 | |
AT&T | East San Bernardino County District | March 20, 2023 | CA2023-1030 | |
Cox Communications | Southern San Diego County | March 20, 2023 | CA2023-1024 | |
Verizon | San Luis Obispo County | February 27, 2023 | CA2023-1026 | |
2022 UTILITY / REPORT LINK | AREA | START DATE | REPORT ID | UTILITY RESPONSE |
Charter | Victorville Marketing Area | October 24, 2022 | CA2022-942 | |
Verizon | Orange County Area | December 19, 2022 | CA2022-937 | |
AT&T | San Bernardino County District | November 14, 2022 | CA2022-943 | |
Verizon | Riverside County District | November 14, 2022 | CA2022-941 | |
AT&T | Orange County North Area | August 22, 2022, | CA2022-939 | |
T-Mobile | Orange County Region | September 26, 2022 | CA2022-940 | |
AT&T | San Bernardino County District | November 14, 2022 | CA2022-943 | |
Charter | San Diego County District | December 5, 2022 | CA2022-951 | |
Comcast | South Valley Region | September 26, 2022 | CA2022-1017 | |
AT&T | North - Shasta/Tehama | October 10, 2022 | CA2022-1022 | |
AT&T | San Luis Obispo County District | July 11, 2022 | CA2022-945 | |
Frontier | Ontario Region | October 24, 2022 | CA2022-936 | |
Verizon | North Bay Region | August 15, 2022 | CA2022-1016 | |
AT&T | Bay Region Contra Costa | August 1, 2022 | CA2022-1011 | |
T-Mobile | Orange County Inland Empire (OCIE) Region | August 8, 2022 | CA2022-933 | |
Charter | Malibu District | July 18, 2022 | CA2022-947 | |
T-Mobile | Los Angeles County Region | July 18, 2022 | CA2022-946 | |
Catalina Broadband Solutions | Catalina Island | July 11, 2022 | CA2022-944 | |
Frontier | Monrovia Region | June 27, 2022 | CA2022-934 | |
Crown Castle Communications | Los Angeles & Orange County District | June 20, 2022 | CA2022-938 | |
Comcast | North Valley Region | May 23, 2022 | CA2022-1005 | |
Frontier | San Bernardino Region | March 21, 2022 |
CA2022-932 | |
AT&T | San Francisco & San Mateo Counties | March 7, 2022 | CA2022-997 | |
Charter | Bakersfield Marketing Area | February 7, 2022 | CA2022-999 | |
North - Palo Cedro | January 24, 2022 |
CA2022-996 | ||
2021 UTILITY / REPORT LINK | AREA | START DATE | REPORT ID | UTILITY RESPONSE |
AT&T |
Los Angeles County District |
May 24, 2021 |
CA2021-901 | |
WAVE | Peninsula |
June 28, 2021 |
CA2021-919 | |
Sierra Telephone |
Madera/Mariposa Counties |
April 12, 2021 | CA2021-918 | |
Charter |
Orange County |
June 14, 2021 | CA2021-904 | |
Cox Communications |
Santa Barbara County |
February 22, 2021 | CA2021-889 | |
Frontier |
Orange County |
August 2, 2021 | CA2021-909 | |
Frontier |
Malibu | May 17, 2021 | CA2021-900 | |
Frontier |
Camarillo | July 12, 2021 | CA2021-924 | |
ATT | San Diego County |
April 12, 2021 | CA2021-895 | |
2020 UTILITY / REPORT LINK | AREA | START DATE | REPORT ID | UTILITY RESPONSE |
Zito Media | Julian/Borrego Springs | March 9, 2020 | CA2020-885 | |
AT&T | Kern | June 2020 | CA2020-861 | |
Comcast | Santa Barbara | June 2020 | CA2020-865 | |
AT&T | Ventura | June 2020 | CA2020-886 | |
Verizon | Bay Area | July 20, 2020 | CA2020-873 | |
AT&T | South Valley - Monterey | March 9, 2020 | CA2020-860 | |
Charter |
Santa Barbara County | October 12, 2020 | CA2020-875 | |
Frontier |
Goleta | November 30, 2020 | CA2020-868 | |
T-Mobile |
San Diego |
October 12, 2020 | CA2020-872 | |
Cox Communications | Palos Verdes / Orange County District | November 9, 2020 | CA2020-871 |