California Public Utilities Commission (CPUC) safety engineers work to keep communities safe by performing regular safety inspections on equipment that generates and supplies energy to your community. This equipment, or energy infrastructure, includes power plants, electric transmission lines, electric substations, electric distribution lines, and gas pipelines. The safety inspection can last from approximately one week up to four weeks. No action is required by the public.
Inspection reports will be posted approximately 180 days after completing the inspection.
If you have questions about the inspection/audit schedule, contact Business and Community Outreach at outreach@cpuc.ca.gov.
Inspection/Audit Schedule
4th Quarter 2024 |
Start Date |
Utility | Equipment Type |
Jurisdictions Affected by Infrastructure Safety Inspection |
---|---|---|---|---|
September/ |
9/30/2024 | PG&E | Natural Gas Transmission Pipelines | Campbell, Cupertino, Gilroy, Los Altos, Los Altos Hills, Los Gatos, Milipitas, Monte Sereno, Morgan Hill, Mountain View, Palo Alto, San Jose, Santa Clara, Saratoga, Sunnyvale |
October | 10/21/2024 | PG&E |
Natural Gas Distribution Pipelines | Benicia, Colusa, Davis, Dixon, Faifield, Folsolm, Galt, Iselton, Rio Vista, Sacramento, Suisun City, Vacaville, Vallejo, West Sacramento, Williams, Winters, Woodland |
October | 10/28/2024 | SDG&E | Liquid Natural Gas Facilities | Borrego Springs |
December | 12/9/2024 | City of Victorville |
Natural Gas Distribution Pipelines | Victoville |
3rd Quarter 2024 |
Start Date |
Utility | Equipment Type |
Jurisdictions Affected by Infrastructure Safety Inspection |
---|---|---|---|---|
July | 7/8/2024 | PG&E | Natural Gas Transmission Pipelines | Tulelake, Burney, Gerber, Colusa, Willows, Meridian, Anderson, Chico, Corning, Dorris, Dunsmuir, Etna, Fort Jones, Gerber, Gridley, Montague, Mount Shasta, Orland, Oroville, Paradise, Portola, Red Bluff, Redding, Shasta Lake, Susanville, Tehama, Weed, Willows, Yreka, Auburn, Colfax, Grass Valley, Lincoln, Live Oak, Loomis, Loyalton, Marysville, Meridian, Nevada City, Placerville, Rocklin, Roseville, South Lake Tahoe, Sutter, Truckee, Wheatland, Yuba City, Benicia, Colusa. Davis, Dixon, Fairfield, Folsolm, Galt, Isleton, Rio Vista, Sacramento, Suisun City, Vacaville, Vallejo, West Sacramento, Williams, Winters, Woodland |
July | 7/22/2024 | SoCal Gas |
Natural Gas Distribution Pipelines | Alhambra, Burbank, Calabasas, Glendale, Hidden Hills, La Canada Flintridge, Los Angeles, Pasadena, Simi Valley, South Pasadena |
August | 8/5/2024 | PG&E | Natural Gas Transmission Pipelines | City of Redding |
August | 8/12/2024 | SoCal Gas |
Natural Gas Distribution Pipelines | Aliso Viejo, Anaheim, Buena Park, Cerritos, Costa Mesa, Cypress, Dana Point, Fountain Valley, Fullerton, Garden Grove, Hawaiian Gardens, Huntington Beach, Irvine, La Mirada, La Palma, Laguna Beach, Laguna Hills, Laguna Niguel, Laguna Woods, Lake Forest, Lakewood, Long Beach, Los Alamitos, Mission Viejo, Newport Beach, Orange, Placentia, Rancho Santa Margarita, San Clemente, San Juan Capistrano, Santa Ana, Seal Beach, Stanton, Tustin, Villa Park, WestminsteralGas |
August | 8/19/2024 | PG&E | Natural Gas Transmission Pipelines | Amador, Angels Camp, Escalon, Ione, Jackson, Lathrop, Lodi, Manteca, Plymouth, Ripon, Stockton, Sutter Creek, Tracy |
September | n/a | n/a | n/a | n/a |